videoControl

Manufacturer ODM Electric Warm Air Blower

Lead Time: 15–25 days
US$ 15
500–999 Pieces
US$ 13
≥1000 Pieces
Product Information
View More
Material
Glass, Plastic, Polyimide, Rubber, Silicone, Steel
Type
12V extension cord, 12V splitter, Fan, Food cooker, Heated cup/mug, Light, Refrigerator, Stove, Travel cooler
Feature
Heated, Fold, Fast heating, Energy saving, Stocked, Multifunction, With lid, Eco-friendly, 360 degree rotating, Low Maintenance Cost, Competitive Price, Automatic, Easy to Operate, Long Service Life, High-accuracy, Remote Control
Application
Electric heater, Kitchen, Electric vehicle, Home appliance, Heater, Household, Car, Hotel, Outdoor, Commercial, Bathroom, Rv, Garage, Garden, Office, Heater Parts, Home, Bedroom, Living Room, Cars
Shipping Notes:
According to buyer's order
Tour Now
Super Supplier

5 yrs

Verified Maufacturer
China
This supplier has a Global Sources Website for 5 years.
Response Rate:  High
Avg Response Time: ≤24 h
Trade Shows
We exhibited at 4 Global Sources Trade Shows. View More
Business Type
Manufacturer,  Exporter
Chat

Explore Car Electronics & Security Products at Global Sources Hong Kong Shows

Global Sources Hong Kong Show Spring 2027
Phase 1: 11–14 Apr | Phase 2: 18–21 Apr
AsiaWorld-Expo, Hong Kong
Product Information
Model NumberODM-05Brand NameSyhogy or OEM or ODM
originChinaSmall OrdersAccepted

Key Specifications/ Special Features:

Manufacturer ODM Electric Warm Air Blower

The heater is a combined unit composed of a ventilator, an electric motor and an air heater. Applicable to all types of workshops, when the air is free of dust and flammable or explosive gases, can be used as circulating air heating

For the ODM Electric Warm Air Blower, what we are doing?

1. Customer provide a BOM, we offer our quotation in 3~5 days.

2. We suggest alternative components to customer, to help to reduce the cost, and delivery time.

3. Samples making for approval, the samples delivery time normally 10-15 days.

4. Mass production, delivery time about 15-25 days, according to the quantity and the components delivery time.

ODM Electric Warm Air Blower:

1. Customer provide a function request, Our engineer team design the function parts(PCBA) according to customer request.

2. We provide a schematic for customer's approval and offer our quotation.

3. Samples making for customer approval.

4. Mass production, delivery time about 15-25days, according to the quantity and the components delivery time.

We are the professional PCBA,ODM Electric Warm Air Blower and electric product manufacturer, you can send us more details you want for our checking and evaluating.

With our years experience R&D,production and marketing,we can provide one stop service from design to final manufacturing for bring customer's idea into reality.

We have our own SMT, injection molding equipment and professional assembly workshops. We can help you design the whole product from PCBA into the finished product.


Shipping Information

FOB PortXiamenLead Time15–25 days
Weight per Unit1.0 KilogramsDimensions per Unit30.0 x 20.0 x 40.0 Centimeters
Units per Export Carton30.0Export Carton Dimensions L/W/H55.0 x 39.0 x 37.0 Centimeters
Logistics attributesCommonExport Carton Weight1.0 Kilograms

Main Export Markets

Main Export Markets
Asia, 
Australasia, 
Central/South America, 
Eastern Europe, 
Mid East/Africa, 
North America, 
Western Europe
Payment Details
Payment MethodTelegraphic Transfer in Advance (Advance TT, T/T)

Send a direct inquiry to this supplier

0/ 1500