Finding industrial parts & components

Global SourcesUpdated on 2024/01/26

Hot Topics

Just for You

by Cecile de Veyra (Managing Editor)

No longer a lesser material, in recent years plastic has been increasingly used where metal was formerly the only choice in many industries. Innovations have made it just as strong, with types such as industrial plastic even more rugged than steel. In electronics applications, plastic is the safe material to use for insulation, housings, circuit boards and PCB hardware for its nonconductive nature. Yet it has also been imbued with electrical properties, extending its versatility, in addition to the significant weight reduction and miniaturization offered. Some herald plastic as the future of manufacturing.

However, metal remains just as viable a material, especially for applications exposed to extreme temperatures. Most metals are more heat-resistant, having a higher melting point than plastic. In addition, metal parts can be fabricated using a broader range of methods such as CNC milling and turning, extrusion, casting, injection molding, forging, punching, shearing, welding, stamping and 3D printing.

Regardless, demand for precision parts on both sides continues to rise and in their midst are molds, also known as “the mother of industry,” and dies, which are essential to producing all these components in big volumes.

For buyers looking for metal and plastic fabrication services or molds for industrial manufacturing, here are samples from Global Sources verified suppliers.

Huayi International Industry Group Ltd’s HYIW0100119 is a CNC-machined turned part made of anodized aluminum. MOQ is 10 pieces and lead time five to seven days. OEM and ODM orders are welcome. The ISO 9001-, 14001- and ISO/TS 16949-compliant supplier uses CNC lathe machines from Japan, Germany and the Taiwan region.

For bicycles, this CNC-machined turned part from Shenzhen Ponyo Technology Co. Ltd, the PY-C185, can be made of aluminum, steel, copper and brass, iron, stainless steel or engineering plastic and with tolerance as tight as ±0.005mm. Surface treatment options are polished, mirror polished, anodized, and nickel-, zinc- and chrome-plated. QC includes IQC and PQC. MOQ is three pieces and lead time seven to 30 days.

From Shenzhen Senmold Plastic Mold Co. Ltd, the SEN-0012 is a plastic injection mold for automotive parts. It is made of P20 mold steel, H13 hot work steel, aluminum or stainless steel, with a two- or three-plate mold as tool type. Options in gate design are direct, hot runner, fan, valve, sub and tunnel. Mold finish may be polished or textured. Mold standard used is DME, Hasco or MasterFlow and design software AutoCAD, SolidWorks, Pro-E or UG. An order of one set is accepted. Lead time is 30 to 45 days.

A metal part for pressure switches, the MS-220218-008 is made using in-die riveting and silver contact assembly. The materials are C2680 brass and C5191 phosphor bronze. Dimensions are 55x26x0.15mm.

Dongguan Fortuna Metals Ltd requires an order of at least 10,000 pieces. Lead time is 20 to 40 days.

Zhuhai Dakini Technologies Co. Ltd’s DKN1222 is a mold for plastic injection parts. Its inner core is made of S136, NAK80, 718H, 738H or P20 mold steel. This mold can be used in making ABS, PP, nylon 66, POM, PLA, bamboo PLA, wood-filled PLA, bamboo PP, glass fiber reinforced nylon 66 and POM, PC, PET, PS, acrylic and transparent ABS. An order of one set is accepted.

Sumitech Precision Machinery Technology (Dongguan) Co. Ltd offers the SMT-781, a stainless steel part made using 5-axis CNC machining. There are also aluminum, steel, brass, copper and plastic variants, depending on the requirement. MOQ is 50 pieces and lead time seven to 15 days.

The model HYAZ70115 from Huayi International Industry Group Ltd is a CNC-machined aluminum part for applications, including cars, machineries, electronics, electronic components, furniture and sports equipment. Tolerance is ±0.05mm. Surface treatment may be anodized, zinc-, nickel-, chrome-, silver- or gold plated, or powder-coated. Versions made of iron, carbon steel, brass, copper, phosphor bronze, beryllium copper or as specified are also available. An order of at least 500 pieces is required. Lead time is seven to 15 days.
Source the latest products from verified suppliers on our global sourcing platform, or install our app. Subscribe to our magazines for more in-depth insights and product discovery.

More Sourcing News

  • Leave us Feedback

  • Download App

    Scan the QR code to download

    iOS & Android
    iOS & Android
    (Mainland China)