By Renaud Anjoran
A few months back, I wrote about how some buyers can no longer put up with their suppliers’ quality issues. And I often lament on the poor state of quality systems here.
In this article I’d like to mention the other enormous source of frustration for foreign buyers: the high minimum order quantities (MOQs) and the long lead times.
High MOQs and long lead times are tightly linked
They come from the same underlying issue: the “big batch & long queue” mentality.
Industrial engineers, as well as financial controllers, are taught that, under a certain lot quantity, it becomes uneconomical to produce. (This, and much more, is explained in depth in the book Factory Physics.) And most manufacturing managers believe this.
Therefore, they follow this approach:
On the other side, what does ‘world class manufacturing’ look like?
Let’s look at one of the most advanced industries, from a process excellence standpoint: the car industry. In pretty much all Toyota plants, each car on the line is different. Think of the advances it required:
Is this only possible for making cars? Of course not. Your products probably don’t have 6,000 parts. If it is possible with cars, it is for most other goods.
For example, David Collins (now CEO of CMC), after 20+ years spent working in auto plants, applied this approach to a Foxconn production facility, with these results for for computers:
You can read about three examples of Chinese factories that went in the direction of ‘flexible manufacturing’ here (on the CMC website).
What can you expect from your Chinese supplier?
If they do mass production (many identical pieces), don’t mention that they should have an MOQ of 1. They will laugh or be offended. It’s just not something they can imagine.
However, they can work on these types of improvements:
If new products are developed routinely, what I listed above is not sufficient. There are a lot of best practices for the new product development process too, and they tend to be totally ignored in China.
What are the benefits for importers?
Shorter lead times and lower MOQs mean orders can be given later (with less risk, which means a lower safety stock). It makes a big difference to cash flow for the buyer, and it reduces the risk of unsold inventory.
I am not talking about a few more days of cash flow. In some cases, an operation organized for speed can deliver goods 2 months earlier than most local competitors. I have seen it.
It also means more reactivity. When an unforeseen sale opportunity arises, there is a greater chance to grab it and satisfy it in time.
If you are in certain industries, it makes for a powerful competitive advantage. Think fashion accessories (eyewear, watches…). A designer can finalize a new concept and have it in stores much faster.
I remember touring the Dongguan Luxottica plant and hearing them boast about their 19-day production lead time (for acetate glasses, if my memory is correct).
Does it also help with quality?
Definitely. This is basically a set of moves in the direction of lean manufacturing, which is known to drive the proportion of defective parts very, very low over time.
Why is that? Here are a few ways this happens:
My conclusion is, high MOQs and long lead times are only the result of your suppliers’ poor organization and bad habits. The hard part is to get them to open their eyes…
Renaud Anjoran has been managing his quality assurance agency (Sofeast Ltd) since 2006. In addition, a passion for improving the way people work has pushed him to launch a consultancy to improve factories and a web application to manage the purchasing process. He writes advice for importers on qualityinspection.org.